Highlights of the project initiated in the summer of 2011 included the granting of the line’s commercial licence in May 2016 and the handover of the line to SNCF Réseau. Throughout the project, from the design studies to the works and subsequent integration testing of all rail facilities (including the traction power supply, low-voltage electrical, catenary and signalling systems, telecommunication networks and control rooms), our employees demonstrated their strong skill fit and expertise, enabling the line to enter service on schedule and at the required standard of quality.